Served as Resident Engineer providing construction management, inspections, and field testing for the upgrade of a booster station on behalf of Trabuco Canyon Water District. The project included installation of three 2 CFS pumps, upgrade of one pump with a variable frequency drive (VFD), and comprehensive electrical improvements, including an on-site generator with automatic transfer switch (ATS), new electrical control room, and telemetry upgrades. Additional improvements included upgrades to the pump building, paving, fencing, and associated pipelines and appurtenances. As the Owner’s representative, MCM also reviewed construction documents and evaluated change order requests to ensure alignment with project scope, schedule, and budget.
Ridgeline Pump Station